The Project :The construction of a new Naval Base in Ksar Sghir ,in the straits of Gibraltar near the Port complex of Tangier Med.
Project Outline:The project required:The Construction of a 1,200m long, main breakwater to -15m depth.The Construction of a 270m long secondary breakwaterThe Dredging & rock excavation of the access channel and quay foundation trenches for a total of 110,000m3 of very hard material.The Construction of protective embankments for land reclamation works.Land reclamation works for the creation of 10 hectares of new land.Main Contractor :SOMAGEC S.ADredging & Rock excavation works : Atlantic Dredging
Dipper Dredger “ATLAS” & Clam shell “PROTEAS”at work in the channel